Real-time OEE monitoring in GoodMills' production

Automatic data collection and real-time OEE on two flour packaging lines, replacing paper- and Excel-based production plan tracking.

Customer
GoodMills, Komárom
Industry
Milling
~15%OEE improvement after go-live
2flour packaging lines
~6 monthsduration of the implementation

In brief

Challenge

OEE was not calculated, planning and tracking were paper- and Excel-based, and downtime and scrap could only be analysed after the fact.

Solution

REACH Real-Time OEE Monitoring: automatic data collection from PLCs and sensors, downtime causes, comparison with the production plan, scrap analysis and shop floor displays.

Result

Measured OEE improved by about 15%, Excel-based data handling was eliminated, and losses are visible in real time.

Starting point – paper- and Excel-based production planning, without real-time efficiency measurement

At GoodMills' Komárom site, OEE was not calculated before the project began. The output of the flour packaging lines was tracked mainly against the production plan, and planning and results tracking relied on paper- and Excel-based processes.

Production data was not available in a uniform, real-time system, so during operation it was not clearly visible:

  • when and for how long a production line stands still
  • what causes each period of downtime
  • how actual performance compares with planned production
  • what type and quantity of scrap is generated
  • how these factors together affect manufacturing efficiency

Problems were typically analysed after the fact, based on manually collected data. As a result, managers and shift supervisors had no uniform set of metrics that would have shown production losses and their causes in real time.

A key role in launching the project was played by an internal manager who was well versed in the OEE methodology and committed to digitalisation. At their initiative, work began on a system that introduced OEE-based performance measurement in addition to digitalising production data. The implementation was also supported by a grant scheme, which funded a significant part of the implementation costs.

We first piloted the concept at GoodMills' Tiszapalkonya site, and the production rollout then took place at the Komárom plant, on two flour packaging lines.

Implemented solution – REACH Real-Time OEE Monitoring

At GoodMills' Komárom site, Mortoff implemented a full-scope OEE monitoring solution built on the REACH platform. The aim was not simply to build a dashboard but to create a real-time performance management system that makes manufacturing losses visible by measuring and analysing the Availability, Performance and Quality components together, in detail.

Automatic data collection from the production lines

The system automatically collects the data needed for operation from the PLCs of the production lines and from sensors installed on the lines. The information is extracted by Mortoff's own telemetry component and forwarded to an InfluxDB time-series database.

The collected data includes:

  • machine state
  • piece count
  • cycle time
  • production speed
  • error codes
  • scrap data

Automatic data collection ensures that the OEE calculation is based not on manual data collected after the fact but on structured production information that is continuously available.

Availability – uncovering downtime and its causes

The system automatically detects when a production line is running and when it stops, so the duration of downtime can be determined precisely. Beyond the bare time data, however, the cause of each stoppage is also crucial: shift supervisors record the cause of each stoppage on an interface built for this purpose.

As a result, it is visible not only how long a given line did not produce but also what caused the loss. Downtime and downtime causes can be analysed by shift and historically, which makes it possible to identify the specific problems behind poor availability figures.

Performance – comparing the production plan with actual performance

The Performance component is based on REACH's production scheduling and shift management function. The production plan can specify to the minute which product has to be produced on which line in a given shift, from when to when, and in what planned quantity.

The system automatically compares the plan with actual production data, so it is immediately visible how much of the required quantity was produced in the given shift. You can drill down behind the Performance value, so a weak metric can be examined not just as a percentage deviation but as a concrete production loss.

Quality – analysing scrap by type and quantity

For the Quality component, the system makes the scrap generated traceable by shift. Users can analyse the total scrap quantity, the individual scrap types and the piece counts belonging to them.

Quality information that was previously available only with a delay thus became quickly searchable in a single system and historically, supporting an understanding of what specific problems lie behind a deteriorating Quality metric.

Real-time OEE dashboard and shop floor display

REACH continuously calculates the total OEE value from the Availability, Performance and Quality components. All three components can be analysed in detail, so users can drill down from the aggregate metric all the way to the underlying causes of loss.

The current OEE and the related production information are available on TV displays placed on the shop floor as well as on managers' computers. So the same data serves both day-to-day operations and management decision-making.

The system was implemented in approximately half a year and supports the operation of two flour packaging lines.

Results

With the introduction of REACH, full-scope, real-time OEE-based measurement of manufacturing efficiency became possible at GoodMills' Komárom site for the first time. The previous paper- and Excel-based production plan tracking was replaced by a system built on automatic data collection and uniform performance measurement.

With the use of the system, the measured OEE value showed an improvement of about 15% in the period after go-live. Behind the improvement was not a single intervention, but the fact that production losses that were previously visible only with a delay, or not at all, became continuously and systematically analysable.

One of the most important changes took place in the handling of downtime. Besides the duration of stoppages, their causes also became visible, so it can be identified more precisely which problems degrade availability the most. This creates an objective basis for prioritising recurring losses and for targeted improvement measures.

A similar change took place in the handling of quality data. The piece count and type of scrap can be analysed by shift in a uniform system, instead of being available only with a delay as before. A deterioration of the Quality metric can thus be traced back to specific scrap causes and quantities.

Real-time tracking of the Performance component created a direct link between the production plan and actual production. The shift's performance can already be compared with the plan during operation, so it is recognised faster when output falls short of what is expected.

Another important result of the project is the replacement of Excel-based data handling. With automatic data collection, manual data processing decreased, while production information was placed in a uniform, searchable system that is immediately available at management level too.

Overall, as a result of the project, GoodMills' manual operation built on production plan tracking has turned into real-time OEE-based performance management. Losses have become visible, analysable and searchable, and OEE has become an active tool of day-to-day production management instead of an after-the-fact analysis.